Not sold blank. This garment is supplied decorated with your logo (embroidery or print). Add your logo in the Logo Studio or request a quote — pricing is confirmed on your quote.
Curved Hem - Light Weight
Delivery Australia-wide. Freight is confirmed on your quote.

| Brand | AS Colour |
|---|---|
| Style | 4055S |
| Type | Long Sleeve T-Shirt |
| Colour | Black, Navy, Grey Marle |
| Size | XSM, SML, MED, LRG, XLG, 2XL |
| Supplier | AS Colour |
| Gender | Women's |
| Fabric | Light weight, 150 GSM, 34-singles, 100% combed cotton (marles 15% viscose) |
| Fabric weight | 150 gsm |
| Features |
|
| SKU | ASC-4055S-BLACK-XSM |
Add your logo with embroidery or DTF printing, both done in Australia. Dye-sublimated garments are made to order (polyester only), usually 2–4 weeks from the approved design. Upload your logo above or send it with your quote. You get a free proof within 1–3 business days, and nothing is printed or embroidered until you approve it.
PNG, JPG, SVG, PDF, AI or EPS, up to 19 MB. Vector files (SVG, PDF, AI, EPS) give the sharpest result.

Pick anything below to add it to the same quote — mix sizes, colours and quantities in the quote drawer.